Validate your process in the D-Innocenter

At our 2,000 m² D-Innocenter in Sevenum, you can test your product and process setup before final engineering. Under near-industrial conditions, we investigate how your product behaves in the process and whether the proposed setup delivers the required result.

For complete installations, the D-Innocenter also provides the space to assemble and verify the system before shipment. By moving more validation and preparation to Sevenum, you gain greater certainty about the process and a better basis for planning installation and start-up.

Reduce uncertainty before start-up

Before a new production line reaches your production site, you want to know whether the process works with your actual product. You also need confidence that the required capacity and product quality can be achieved.

The D-Innocenter helps move critical testing and verification to an earlier stage of the project. We can validate the process before final engineering and, for complete lines, verify the installation before shipment. This allows adjustments to be made while the project is still at Dinnissen, instead of during installation or commissioning at your site.

For projects using Dinnissen’s Vertical Start-up approach, the complete line is assembled in Sevenum in the configuration in which it will later operate. The line is run with the customer’s actual product and checked against the agreed performance requirements before shipment. As a result, less technical work remains to be resolved during on-site commissioning.

Read more about Vertical Start-up

Still 2026-10-07 141338_1.56.2.jpg
Still 2026-10-07 141633_1.12.jpg

Test the process, verify the installation

The D-Innocenter supports two different stages of a project. Process validation takes place before final engineering. Installation verification takes place once the line has been engineered and built.

Test hall: validate the process

In the test hall, we use your actual product to investigate whether a proposed process works as intended. Individual machines can be tested separately or combined into an integrated setup. The results provide practical data for final engineering and scale-up.

FAT hall: verify the installation

Once the installation has been engineered and built, it can be assembled and verified in the FAT hall before shipment. Adjustments can be handled at Dinnissen instead of during installation at your production site. This reduces the work required on site and helps shorten installation and commissioning.

What can you test in the D-Innocenter?

The test setup depends on your process question. We can test one machine or combine the relevant process steps to evaluate how the setup performs with your product.

  • Product quality and homogeneity
    • Check whether the process delivers the required product properties and mixing result.
  • Capacity and process performance
    • Measure whether the machine or line reaches the required output under practical conditions.
  • Product behavior  
    • Investigate how the material responds during handling and processing, including flow behavior or product breakage where relevant.
  • Dust, hygiene and residue
    • Evaluate the aspects that are relevant to product quality, cleaning or the process environment.
  • Recipes and raw materials
    • Test how a changed recipe or material influences the process and the end result.
  • Automation and line interaction
    • Verify how equipment, pneumatic transport and control work together as part of the complete process.

Test and analyze your actual product

The same machine can perform differently depending on the material being processed. Product properties influence how material moves through equipment and can affect both process performance and final product quality. That is why we test with your actual product wherever possible. Instead of relying only on calculations or simulation, we can see what happens when the material passes through the proposed process.

Where relevant, we first analyze the product in our quality laboratory. These findings help determine what needs to be measured during the practical test and how the setup should be configured.

Discuss your process question

Still 2026-10-07 134502_1.9.1.jpg

Verify the complete installation before shipment

Process validation and factory acceptance testing serve different stages of the project. Once the final installation has been built, complete systems can be assembled and verified in the FAT hall before shipment.

For a complete line, verification can cover the agreed output and capacity as well as the required product quality. Pneumatic transport and the complete automation can also be checked as part of the installed process. Where the project requires it, this work is carried out together with the customer and with the actual product. If adjustments are required, they can be made while the installation is still at Dinnissen. The line reaches the customer’s site with more of the critical preparation already completed.

Still 2026-10-07 150948_1.26.1.jpg

Move critical start-up work to Dinnissen

For complete production lines, the D-Innocenter supports Dinnissen’s Vertical Start-up approach. The line is assembled at Dinnissen as it will later operate at the customer’s site. After the process and installation have been verified, the system is divided into skid frames and shipped.

On site, the focus shifts to installing and connecting the skids and completing the final test run. Because more technical preparation has already been completed in Sevenum, fewer issues need to be resolved during commissioning.

The Vertical Start-up concept shows what this can mean in practice. The customer has already seen the line operate with the actual product and can verify the agreed quality and performance requirements before shipment.

Read more about Vertical Start-up

FAT in practice: NZIC

For New Zealand Independent Cement, Dinnissen assembled the complete process line in Sevenum for a factory acceptance test before shipment to New Zealand.

During the FAT, NZIC and project partner Skookum were able to see the complete line in operation and identify operational improvements before dispatch. Because the initial testing took place at Dinnissen, there was also less need for testing support after shipment.

Read the NZIC customer story

image.jpg

For new production lines and existing processes

The D-Innocenter can support the development of a new production line as well as changes to an existing process. For a new line, physical testing provides data before final engineering starts. For an existing process, a planned change can be evaluated before it reaches the production floor. This gives you practical information while the process can still be adjusted, without using your own production environment for trial and error.

From process question to test results

Every test starts with a specific question. We determine the setup and measurements based on your product and the result you need to achieve.

1. Define the process question

We determine what needs to be validated and what result the process needs to achieve.

2. Examine the product

Where relevant, we analyze the material in our quality laboratory to understand the properties that may influence the test.

3. Build the test setup

We select and combine the equipment required to reproduce the relevant part of your process.

4. Test and collect data

Your actual product runs through the setup while we record the data needed to answer the process question.

5. Apply the results

The findings are used as input for final engineering and the required equipment settings.

Still 2026-10-07 150620_1.77.1.jpg

Part of Dinnissen system integration

The D-Innocenter is part of our system integration approach. Because testing and engineering take place within Dinnissen, findings from the D-Innocenter can be incorporated directly into the process design.

The same connection continues later in the project when the completed installation is prepared for shipment and commissioning. What is tested in Sevenum feeds directly into what is ultimately installed at your production site.

Read more about system integration


Put your process to the test

Do you have a process question you want to validate before implementation?

Tell us what you want to achieve. Together, we determine what needs to be tested and which setup is required.

Łukasz Patyk
Manager D-Innocenter
+31 6 89910897
[email protected]

Discuss your process question

Łukasz Patyk is ready
to help you

+31 6 899 108 97
[email protected]

Frequently asked questions about the D-Innocenter

 

1. What is the D-Innocenter?

The D-Innocenter is Dinnissen’s 2,000 m² facility in Sevenum for process testing, validation and factory acceptance testing. Customers can test their actual product and process setup before final engineering. Complete installations can later be assembled and verified before shipment.

2. Why was the D-Innocenter developed?

The D-Innocenter moves important testing and verification to an earlier stage of the project. It gives customers more certainty about process performance and product quality before implementation and reduces the amount of technical work that remains during start-up.

3. What is the difference between process testing and FAT?

Process testing is used to validate how the proposed process works with the actual product before final engineering. Factory acceptance testing takes place after the installation has been built and is used to verify the completed system before shipment.

4. Can I test a single machine?

Yes. A test can focus on one machine or on several machines combined into a process setup. The configuration depends on the process question you want to answer.

5. Can I test my own product?

Yes. Testing with your actual product allows us to see how the material behaves in the proposed process. This gives practical information that calculations and simulations alone cannot always provide.

6. What can be tested in the D-Innocenter?

Testing can focus on product quality, capacity, product behavior, dust, recipes or planned process changes. For complete lines, pneumatic transport and automation can also be verified as part of the installed process.

7. What is the role of the quality laboratory?

Where relevant, the material is analyzed before the practical test starts. The findings help determine how the test should be configured and which parameters need to be measured.

8. Can the D-Innocenter be used for an existing production process?

Yes. A planned process change can be tested before it is introduced into production. This allows you to evaluate the effect without using your production line as the test environment.

9. How can the D-Innocenter help shorten commissioning?

Process questions can be answered before final engineering, while the completed installation can later be verified before shipment. With Vertical Start-up, the complete line is assembled and checked in Sevenum before it is divided into skid frames and shipped. By completing more of this work in advance, the time required for commissioning on site can be reduced considerably.

10. How do I start a test at the D-Innocenter?

Start with the process question you want to answer and the result you need to achieve. Together, we determine the required test setup and the data that needs to be collected. Contact Łukasz Patyk, Manager D-Innocenter, at +31 6 89910897 or [email protected].

We are proud that these companies rely on Dinnissen

Nestle
Nutreco
DSM
Danone
BAYER

View all of our references

What customers say about us

Unique in preliminary work

What really makes Dinnissen unique, is the preliminary work. You can literally count every bolt and nut in the drawing.

AAK

Kenneth Gijzen- Maintenance & Engineering Manager - AAK Rotterdam

Read more

Didn't consider any other option than Dinnissen

When the mixers needed replacement and Dinnissen could do a one-on-one replacement, we really didn't consider any other option than Dinnissen.

Voergroep Zuid

Elmar Flach- Technical Specialist - Voergroep Zuid

Read more

Tailor-made solution for every problem

What charmed us most about Dinnissen was that they responded perfectly to our questions each time: they jumped right in and quickly came up with a tailor-made solution to each problem.

Perstorp

Jos Falvay- Project manager - Perstorp

Read more

No challenge is too big

At Dinnissen, they think in terms of challenges, not problems. They don't give up and keep going until there is a solution that satisfies all parties.

United Petfood

Martin Sonneveld- Production Director - United Petfood Waalwijk

Read more

Increased capacity despite using 17 fewer mixers

The amazing part is that we managed to increase the capacity, despite using 17 fewer mixers.

Holland Diervoeders

Edward Depre- Project Manager - Group Depre

Read more

Filled three complete factories

Dinnissen has filled an entire factory for us with a complete production line, on three different occasions. They just get it right: from mixers and sifters to sampling and automation.

Jonker & Schut

Erik Schut- Managing Director - Jonker & Schut

Read more

The importance of hygiene and safety requirements

Dinnissen fully understood the importance of hygiene and safety requirements in our industry. They went the extra mile by providing us with all the necessary documentation, all ATEX drawings, and full traceability.

DSM

Anton Vleeshouwers- Project Director - DSM

Read more

Drastically improved feed-quality

90% of our customers with laying hens have already switched to the new feed produced using the Pegasus® mixer and the Thermidor® system.

Egli Mühlen

Kurt Egli- Former manager - Egli Mühlen

Read more

Mixers have been running 30 years

Dinnissen machines may not be the cheapest in terms of purchase price, but in terms of value for money, there are none better. Our Dinnissen mixer has been running extremely reliably for 30 years.

VDV Group

Adwin van der Vorst- Directeur - VDV Group

Read more

Six-fold increase of total production

Production has gone from 3-5 tons per day to 30 tons per day. That's a six-fold increase in total production.

Nöll & Co.

Michiel de Boer- CEO - Nöll & Co.

Read more

Easily and safely changing sieve basket

The ease and safety with which the sieve basket can be changed were decisive factors in our choice for a Dinnissen sifting machine.

Sudstaerke

Mr. Kreuzer- Company Manager - Südstärke

Read more

Process specialists unafraid to push boundaries

Dinnissen possesses expertise distinct from our in-house capabilities. They are process specialists unafraid to push boundaries and set limits.

MiFood

Raymond Nolet- Founder - MiFood

Read more

Supplied entire installation

Dinnissen is the first company we've worked with that delivers a total package. Because Dinnissen supplied the entire installation, including platforms and safety installations, the entire line is CE-certified.

Steinweg

Michel Kliphuis- Manager - Steinweg Amsterdam

Read more

Mixing time of 60 seconds per batch

Previously, we had standard times in the mixing process of 14 - 15 minutes. With the Pegasus® mixer we achieve a mixing time of 60 seconds per batch.

Planta

Lothar Pixa- Director - Planta

Read more

High-quality vacuum coaters

We chose to work with Dinnissen because they supply high-quality vacuum coaters that fit exactly within our production lines.

Olam Group

Arnold Balledux- Global Technical Head Animal Feeds & Vice-president Animal Feed & Protein - Olam Agri

Read more

Service on weekends

One day there was an important issue and one of Dinnissen's engineers immediately took action during the weekend. I have never seen other foreign partners do this.

APTe Japan

Mr. Kimio Aono- Founder - APTe Japan

Read more

Collaboration based on mutual respect

Our collaboration with Dinnissen is based on mutual respect and trust. We challenge each other to continuously innovate and improve

Vitelia

Stefan Kuijpers- Director - Vitelia

Read more

Choice based on trust, feeling, and price

We made a choice based on trust, feeling, and price. In this total package, Dinnissen came out best.

Vobra

Marcel van den Oetelaar- Proces Technologist - Vobra

Read more

Customized mixers

Dinnissen thought along with us from start to finish. For example, they used existing drawings for these new mixers to save us costs in the engineering phase.

ForFarmers

Pieter Gorter- Project Manager - ForFarmers

Read more

Flexibility, cleaning, short mixing time, and a homogeneous end product

We also considered other options but on the points we considered most important - flexibility, cleaning, short mixing time, and a homogeneous end product - Dinnissen scored best.

Nutri Dynamics

Sam Dimassi- Owner - Nutri-Dynamics

Read more

Technicians, not salespeople

Dinnissen's representatives strive for the best solutions. They are engineers first and salespeople second.

Van Zutven

Frans van Zutven- Founder and Director - Van Zutven

Read more

Fully automated sampling

We considered several machine developers, but the high quality of the Dinnissen machines and the competence and commitment of the employees were decisive for us.

Ausnutria

Arjan van Dijk- Project Manager - Ausnutria

Read more

Quadrupled production capacity

In collaboration with Dinnissen, we have quadrupled our production capacity from 3 to 12 tons per hour.

Solan

Harald Schmalwieser- Managing Director - Solan

Read more

World player in process technology

To realize production processes of the best quality, we work closely with Dinnissen: One of the strongest players in the world in process technology and hygienic design.

Nestle

Gerben Koopmans- Project Engineering Manager - Nestlé

Read more